![]() ![]() 1 (Baltimore Pike) and Interstate 95 in Concord, Bethel and Upper Chichester townships. Section 101 is the first-of-four phases of the overall projects to improve travel and safety on a 6.7-mile section of U.S. While major construction has been completed on the project, the contractor will be performing various minor construction activities that will have minimal impact on traffic. Three dynamic message signs and six closed-circuit TV cameras were installed to optimize traffic flow along the corridor. Five retaining walls were constructed to support the roadway and embankments in widened areas, and 1,500 feet of sound barrier wall was installed along the eastbound lanes between Station Road South and Cambridge Drive. 322 (Conchester Highway) bridges - over Webb Creek/SEPTA lines and over Smithbridge Road - were replaced with new, wider structures. Clayton Park Drive: Widened to include an eastbound right turn lane.Mattson Road/Featherbed Lane: Widened to include eastbound and westbound left and right turn lanes, plus new traffic signals and.Merion Drive: Widened to include an eastbound right turn lane.Cambridge Drive: Widened to include an eastbound right turn lane and westbound left turn lane.Station Road South: Widened to include an eastbound right turn lane.Fellowship Drive/Station Road North: Widened to include eastbound and westbound left turn lanes and right turn lanes, plus upgraded traffic signals. ![]() Spring Valley Road: Widened to include eastbound and westbound right turn lanes.Evergreen Drive: Widened to include an eastbound right turn lane and a westbound left turn lane, plus upgraded traffic signals.322 (Conchester Highway) and two lanes eastbound, plus upgraded traffic signals 1 (Baltimore Pike): Widened to include two left turn lanes, a through lane and a right turn lane from westbound U.S. In addition to widening the heavily traveled east-west suburban artery to two eastbound and two westbound travel lanes, installing a grass median and widening shoulders, the Section 101 project included improvements to seven intersections within the project corridor, including: 322 (Conchester Highway) and has opened the highway to two lanes in each direction from U.S 1 (Baltimore Pike) to Clayton Park in Concord Township, Delaware County. The Pennsylvania Department of Transportation (PennDOT) has completed three years of construction today on the $62.6 million Section 101 contract to widen and improve 2.5 miles of U.S. 322 (Conchester Highway) Widening, Improvements in Concord Township, Delaware County
0 Comments
Leave a Reply. |